Quote:
Originally Posted by martok2112
Indeed...the RMQ design could go quite well with my bridge set up. I don't think it would take me long to rebuild the perimeter of the bridge to accommodate that view port. All the control panels and such are now set pieces that I can just place when ready.
I think I need to redo the command dais anyway. As Jewels pointed out on a different forum, the hand rails for the command dais are a wee bit too high.
|
its a good idea ,,,,, the hand rail was high but i thought that was like i do ..... work in stages trying new things and seen what fits and adjust as needed